Your responsibilities before we arrive:

Play Sets

Preparation

Level installation area that is level within 1” over a ten foot area and 2” over a twenty foot area.
Ensure a clearance area around playset of at least 6’ in all directions (play set + 6’ in all directions)
Ensure no buried utilities, wires, pipes, etc. will interfere with installation.
Ensure you are not planning to position the swing set over top of any sprinkler equipment.
Ensure no overhead obstacles within 6’ of the top of the playset (power lines, roofs, trees, etc.).
Installation of any play surface products (ie: sand, mulch, etc.) should be done ONLY after play set installation is completed.

Gazebos

Leveling

The site is required to be level within 1-2 inches for the installation of the gazebo. If the site is not level, you should level the site by digging out the area or laying a 3-4 inch layer of leveling rock.

We can provide the service (leveling and placing rock) with advance notice at the rate of $45 per man hour.


Plastic

In very sunny areas, we recommend that you put down black plastic or weed barrier cloth to prevent grass from trying to grow up between the floor boards.

Pergolas

 Leveling 

The site is required to be level within 1-2 inches for the installation of the pergola. If the site is not level, you should level the site by digging out the area or laying a 3-4 inch layer of leveling rock.

We can provide the service (leveling and placing rock) with advance notice at the rate of $45 per man hour.


Plastic

In very sunny areas, we recommend that you put down black plastic or weed barrier cloth to prevent grass from trying to grow up between the floor boards.


Before We Arrive

 

Ensure all other debris is removed from he area prior to arrival of our installation crew.

Adult customer MUST be at job site during the entire installation and for the duration of the installation.

Ensure there is ample space to un-package and assemble the unit.

Please arrange for pets and children to be in a separate area during the entire installation process.

Ensure access to an electric power outlet that is working properly within 200’ of the assembly area.